Skip to main content

IT infrastructure solution

Server & server room

Design servers, storage and server rooms around actual operating conditions so critical data and services stay controlled.

Operating context

Problems to solve

Every design begins with operating conditions, risks and the priorities of the teams who use it.

  • Temperature, power and equipment space are not controlled.
  • Monitoring and early alerts for abnormal conditions are missing.
  • Backup and recovery do not follow a clear operating process.

How VNS delivers

A solution delivered in steps

  1. 1

    Assess load, space, power and cooling conditions.

  2. 2

    Design the server, UPS, cooling, racks, cabling and monitoring for the site.

  3. 3

    Test operations and hand over diagrams and guidance to the IT team.

Operational value

What teams can expect

Reduce downtime risk from temperature, power and equipment issues.

Provide clear control points for operations and maintenance.

Be ready to extend capacity as demand grows.

Delivery process

Five control points from survey to handover

  1. 01Survey
  2. 02Design
  3. 03Delivery
  4. 04Testing
  5. 05Handover

Related use case

Explore a related delivery context

Explore a case study and industry requirements to see how these workstreams connect.

FAQ

Frequently asked questions

What information does VNS use to begin a survey?

The team first needs to understand the premises, current state, users, related equipment and operating goals before proposing a design.

Can delivery be phased?

Yes. Scope and control points are defined during the survey to minimise impact on ongoing operations.

An unexpected error occurred. Return home